Product Specifications
| Parameter | Details |
| Part Name | Shock Absorber, Damper, Rubber Vibration Mount |
| Part Number (OEM Reference) | 358172, 4700358172 |
| Brand Compatibility | Dynapac |
| Machine Model Fitment | CA51, CA510, CA512, CA600, CA602, CA610, CA612, CA702, SCA512, SCA610 |
| Material | High-elasticity natural rubber with reinforced metal core |
| Condition | New Aftermarket |
| Warranty | 6 months against manufacturing defects |
| Packaging | Individual blister pack with protective foam and branded carton |
Compatible Models
| Brand | Applicable Models |
| Dynapac | CA51, CA510, CA512, CA600, CA602, CA610, CA612, CA702, SCA512, SCA610 |
Tired of Compaction Equipment Vibrations Causing Operator Fatigue and Frame Cracks? Replace 358172 on Dynapac CA610 and CA702 with OEM-Equivalent Shock Absorber Mounts
Every hour a Dynapac compactor sits idle due to failed vibration mounts costs contractors $1,200–$2,800 in lost productivity and rental penalties. Counterfeit rubber mounts crack within 3 weeks under continuous 20–30 Hz operation — leading to uncontrolled chassis oscillation, hydraulic line fatigue, and premature structural failure. OEM replacements take 18–25 days to arrive, halting road base work mid-project.
OEM-Equivalent Quality, Ready to Ship from Guangzhou Warehouse
This Dynapac vibration mount is manufactured in ISO 9001-certified facilities with strict dimensional control and dynamic load testing at 0–50 Hz frequency range. Designed for high-cycle compaction duty, it delivers consistent damping performance across all Dynapac CA-series machines — from municipal asphalt rolling to quarry subgrade stabilization. With 10 years’ experience supplying vibration control components to European rental fleets and Middle Eastern infrastructure contractors, XUNPO ensures technical accuracy before shipment.
Where This Part Works
This shock absorber mount operates continuously in harsh environments: vibrating at 25–35 Hz during soil compaction on highway projects, absorbing impact shocks on uneven quarry surfaces, and dampening resonance during extended port pavement operations. In demolition sites or landfill liner compaction, where equipment runs 14+ hours daily, correct rubber hardness and metal core alignment prevent mounting bolt shear and frame deformation — making the Dynapac CA702 rubber vibration mount critical for uptime reliability.
Engineering Details That Matter
The rubber compound uses 65±3 Shore A hardness — calibrated to match OEM hysteresis curves and avoid over-damping (which reduces compaction efficiency) or under-damping (which accelerates frame fatigue). The internal steel insert is zinc-plated to ISO 4042 standards, preventing galvanic corrosion when bolted to aluminum housing. Radial and axial tolerances are held to ±0.15 mm — ensuring identical fit with original mounting holes and bushing bores on CA512 and CA610 frames. Compression set after 72-hour static load testing remains below 8%, guaranteeing long-term resilience under sustained 12-ton dynamic loads.
The Real Cost of Wrong Parts
A $12 counterfeit mount may save $8 upfront but fails within 200 operating hours — triggering $420 in labor to disassemble the drum assembly, $1,100 in unplanned downtime, and $3,600 in rework due to inconsistent density readings. Genuine OEM parts cost 42% more and require 3-week lead time. Our Dynapac rubber mount meets ISO 10816-3 vibration isolation standards and delivers 2,500+ hours service life under ASTM D395 compression fatigue testing — reducing total cost of ownership by 31% over 2 years compared to low-grade alternatives.
Why Customers Trust XUNPO
Only ISO 9001-certified factories supply our vibration mounts — incoming rubber batches undergo durometer, tensile, and aging tests per ASTM D412. Every unit passes functional compression cycling before shipment. We provide 6-month warranty covering material and workmanship defects — no questions asked. With 10 years exporting to 120+ countries, including repeat orders from German rental companies and UAE road construction firms, our track record is verified. Our 22-person technical team confirms part compatibility using OEM service manuals and machine serial decoders — response guaranteed within 2 hours. Over 10,000 SKUs, including this Dynapac vibration mount, are stocked in our Guangzhou warehouse for same-day dispatch.
Packaging & Shipping
- Individually sealed in anti-static blister packs with molded EPE foam and labeled retail cartons
- In-stock items ship within 2–5 working days after payment confirmation
- Flexible logistics: Express (DHL/FedEx/UPS), air freight, or sea freight — quoted based on destination and urgency
- Real-time tracking number provided upon dispatch, updated until delivery
- Minimum order quantity: 1 piece — supports urgent field repairs and small fleet operators
Get Your Dynapac Vibration Mount Now
Your CA610 or CA702 compactor shouldn’t wait weeks for a simple mount replacement. Send us your part number (e.g., 358172), exact machine model, and required quantity — we’ll email a competitive quote within 24 hours. First-time buyers can request a sample for physical verification before bulk order. Every day delayed means higher labor cost, missed deadlines, and lower job profitability.
Frequently Asked Questions
Q: Is this an original Dynapac part or an aftermarket replacement?
A: This is an OEM-equivalent aftermarket part, produced in ISO 9001-certified factories to match original specifications in dimensions, material, and performance — not sourced from Dynapac.
Q: How do I confirm if this shock absorber mount fits my specific CA512 or CA702 unit?
A: Provide your machine’s full model name and serial number — our technical team verifies compatibility using official Dynapac service documentation and responds within 2 hours.
Q: What is the warranty coverage for this vibration mount?
A: 6 months from date of delivery against manufacturing defects — including rubber cracking, metal core separation, or dimensional non-conformance.
Q: What is the minimum order quantity?
A: 1 piece — designed for emergency repairs and small-scale maintenance shops.
Q: How fast can I receive the part after ordering?
A: In-stock items ship within 2–5 working days. Express shipping options available for urgent needs — delivery times depend on destination and selected carrier.
Q: Can I request a sample before placing a bulk order?
A: Yes — first-time customers may request one sample unit for physical testing and fitment verification prior to full order.
Ready to order or need a quote?
Send your part number, machine model, and quantity — we'll respond within 24 hours.
WhatsApp: +86 13316055942 | Email: talos@xunpojx.com