Connecting Rod 17311-22014 Replacement for Kubota D1703 Powertrain
<p>Overhaul kit contents verified item-by-item against your specific engine serial before dispatch</p>
View Details
<p><strong>13257-40F06 Rocker Arm Set for Nissan KA24E Engine, SOHC 12V, Heat-Treated Alloy Steel</strong> — compatible with 2.4L KA24E valve train system. Supplied as a matched set covering all cylinder positions to ensure uniform valve clearance and timing post-rebuild. Cross-reference numbers 13257-40F07, 13257-40F16, and 13257-40F17 verified for applicable production years. Adjacent components including push rods, valve springs, and camshaft should be inspected during installation to address root-cause wear. Complete overhaul kit contents verified against your specific engine serial variant before shipment.</p>
MOQ
1 Piece
Lead Time
2-5 Business Days
Shipping
120+ Countries
Warranty
3-12 Months
Compatible Brands
Matched Set Dispatch — every rocker arm in this KA24E kit shares the same tolerance band, verified against engine serial variants before packing.
| Parameter | Value |
|---|---|
| Part Number | 13257-40F06 |
| Product Type | Rocker Arm |
| Cross-Reference | 13257-40F06, 1325740F06, 13257-40F07, 13257-40F17, 13257-40F16, 1325740F07, 1325740F17, 1325740F16 (for identification purposes) |
| Machine Fitment | 1989-1997 Nissan Pickup (2.4L KA24E), 1989-1992 Stanza (2.4L), 1989-1991 240SX (2.4L), 1989-1997 Hardbody Pickup (2.4L), 1990-1995 Axxess (2.4L) |
| Engine Compatibility | 2.4L KA24E SOHC 12V |
| Condition | New Aftermarket |
| Material | High-strength alloy |
| Surface Treatment | Heat treatment |
| Dimensional Tolerance | ±0.02mm |
| Warranty | 3-12 months against manufacturing defects |
| Standards | ISO 9001 |
| Engine System | Related Components |
|---|---|
| Valve train — top-end overhaul | Valve springs, push rods, valve stem seals, camshaft lobes |
| Valve train — noise diagnosis | Hydraulic lash adjusters (if equipped), valve guides, rocker shaft |
| Valve train — full KA24E rebuild | Complete gasket set, timing chain kit, main and rod bearings |
| Valve train — cylinder head service | Head bolts, valve job, guide seals, camshaft bearing set |
A complete overhaul kit does not always mean a complete fit for your specific engine serial.
Rebuild shops regularly receive overhaul packages that list rocker arms generically, only to discover during assembly that the bore sizing or pivot geometry does not match the KA24E variant on the bench. The Nissan KA24E family spans nearly a decade of production with running changes to the valve train, and superseded reference numbers like 13257-40F07 or 13257-40F16 can indicate different rocker arm profiles that are not interchangeable [NEED_CITE: Nissan KA24E valve train running changes across production years]. When one position in the set is wrong, the entire cylinder head stays disassembled while the correct piece is sourced, extending downtime and risking contamination of already-cleaned surfaces. This rocker arm set (cross-reference 13257-40F06) is verified against the specific SOHC 12V configuration, so the set arriving at your bench covers every cylinder position without substitution.
The rocker arm sits at the top of a mechanical chain that begins at the camshaft and ends at the valve face. On the KA24E, each rocker arm transfers cam lobe lift through the rocker pivot to open the intake or exhaust valve against spring pressure. Replacing this component without inspecting the push rod tips, valve spring tension, and camshaft lobe profile addresses only the symptom. A worn cam lobe or fatigued valve spring will destroy a new rocker arm within the first few hundred operating hours, returning the engine to the teardown bench. System-level supply means verifying every contact surface in the valve train before the head goes back on.
The KA24E was produced across multiple vehicle platforms from 1989 through 1997, and running production changes affected rocker shaft bore diameter and pivot pad geometry between early and late builds. When an engine has been through a previous rebuild, oversized or reconditioned valve train components may already be installed, meaning a standard-grade rocker arm set might not maintain proper clearance on a shaft that has been ground or replaced [NEED_CITE: valve train component grading practices after engine reconditioning]. Confirming the engine serial number and any documented rebuild history before ordering ensures the dimensional grade matches what is actually on the bench, not just what the factory build sheet originally specified.
The ±0.02mm dimensional tolerance governs the rocker arm bore and pivot interface, directly affecting oil film thickness and pivot wear rate during operation. High-strength alloy construction with heat treatment ensures the contact pad resists the repeated impact loading from the cam lobe, particularly at the high-lift portion of the ramp where contact stress concentrates. These material and tolerance specifications are meaningful only when the entire set shares the same grade — mixing arms from different production batches or tolerance bands introduces uneven valve timing across cylinders, which manifests as rough idle and uneven exhaust gas temperature. ISO 9001 production oversight provides batch traceability so every arm in the set originates from the same manufacturing run.
Installing a rocker arm that is dimensionally correct for a different serial variant creates micro-misalignment at the valve stem tip, accelerating guide wear and eventually causing the valve to run hot from incomplete seating. When the mismatch is not caught during assembly, the engine may pass initial start-up checks but develop valve train noise within the first weeks of service, forcing a second head removal [NEED_CITE: valve train misalignment effects on valve guide wear progression]. The labor cost of that second teardown far exceeds the price difference between a verified matched set and a generic assortment. Shops that skip serial-level verification absorb this rework cost silently, absorbing lost bench time and customer confidence.
Our technical team cross-checks every reference number against your engine serial before the set ships, catching superseded numbers like 13257-40F17 that may apply only to specific model years. Self-produced lines and qualified sourced supply carry the same warranty, so mixed-source valve train components arrive under a single accountability umbrella. We supply matched sets covering all cylinder positions from one account, eliminating the situation where half the arms arrive from one vendor and the other half from another with different tolerance bands. Sample supply is available for fitment confirmation against your bench before bulk commitment. Guangzhou warehouse stock on common KA24E components supports fast dispatch when a head is already torn down and waiting.
Provide your KA24E engine serial number, any documented rebuild history, and the specific valve train fault you are addressing so we can confirm dimensional grade and set completeness before quoting.
Q: What other valve train components should be inspected when installing new rocker arms? A: Inspect the rocker shaft for scoring, check push rod tips and valve stem ends for wear patterns, measure valve spring pressure, and examine camshaft lobe profiles. A rocker arm rarely fails in isolation — the root cause usually lives elsewhere in the valve train, and replacing only the arm without addressing the underlying fault leads to premature repeat failure.
Q: How do I determine which reference number applies to my KA24E engine? A: Provide the engine serial number and vehicle model year. The KA24E family has running changes across production years, and superseded numbers like 13257-40F07 or 13257-40F16 may apply to specific builds. We verify applicability against your serial before confirming the order, rather than relying on generic application tables.
Q: Does the set cover all cylinder positions or are additional pieces needed? A: The matched set covers every rocker arm position on the KA24E SOHC 12V configuration. Verify your cylinder count and head casting before ordering, as variant configurations exist across the platform range. We confirm set completeness against your specific engine build.
Q: Can I request a sample to confirm fitment before a bulk order? A: Yes. We supply sample units for bench fitment verification so you can check bore sizing, pivot geometry, and valve stem contact pattern before committing to full production quantities. This is particularly important when the engine has documented prior rebuild history that may affect component grades.
Q: What system-level faults commonly cause rocker arm failure beyond normal wear? A: Oil starvation from clogged gallery passages, valve spring fatigue causing float at operating RPM, camshaft lobe wear altering the lift profile, and incorrect valve clearance creating impact loading. Each of these root causes must be corrected during the rebuild, or the new rocker arms will experience the same failure mode within a short service interval.
<p>Overhaul kit contents verified item-by-item against your specific engine serial before dispatch</p>
View Details<p><strong>Connecting Rod 719810-23100 for Yanmar 3TNE78</strong> — forged steel, magnaflux tested, ±0.02mm big end bore tolerance, compatible with 3D78AE, 3D82AE, PC27MR-2/3 and PC20R-8 compact excavators.</p> <ul> <li>Supplied alongside matched con rod bearings, piston sets and overhaul gaskets so bearing grade aligns with crankshaft journal condition from previous rebuilds</li> <li>Rod weight class and big end bore verified against your engine serial before dispatch</li> <li><strong>Overhaul kit contents cross-checked per 3TNE78 variant to prevent missing items at assembly</strong></li> </ul>
View Details<p><strong>1G924-22014</strong></p>
View Details<p><strong>15261-22010, 15531-22010, 15381-22010, 15694-22010 Connecting Rod</strong> — high-strength forged steel, compatible with Kubota D650, D750, D850, D950, V1100, V1200, ZB600 engines.</p> <ul> <li>Selected as part of a matched bottom-end set: rod, con rod bearing, main bearing, piston, and rings must align with crankshaft journal measurements and prior oversize history to prevent early bearing failure.</li> <li>Confirm STD / 0.25 / 0.50 grade against crankshaft grind records before ordering — wrong grade causes clearance mismatch within initial break-in hours.</li> <li>Overhaul kit contents cross-checked against your engine serial variant; dimensional audit and MPI inspection record provided with shipment.</li> </ul>
View DetailsSend us your inquiry and our technical team will verify the part and provide a competitive quote within 24 hours. MOQ starts from 1 piece.
Send Your Inquiry
Fill in the form and we'll get back to you within 24 hours.