Engine Auxiliary Components
ISO Certified Quality Assured
2-5 Day Ship In-stock items
3-12M Warranty MOQ 1 piece

12V Stop Solenoid 7167-620B | System-Matched for DPA DPS Fuel Systems

<p><strong>7167-620B Stop Solenoid, 12V for CAV LUCAS DPA/DPS Fuel Systems</strong> — replacement fuel cut-off solenoid for diesel injection pumps in construction and mining equipment.</p> <ul> <li>Fits DPA and DPS injection pump configurations requiring 12V shutdown control</li> <li>When rebuilding fuel systems, inspect adjacent components including fuel filters, lines, and pump seal kits to address root failure causes rather than single-point replacement</li> <li>Engine serial variants may use different pump builds, so confirming exact injection system variant before ordering prevents rework</li> </ul> <p>Overhaul kit contents and matched components verified against your engine serial before dispatch.</p>

MOQ

1 Piece

Lead Time

2-5 Business Days

Shipping

120+ Countries

Warranty

3-12 Months

Compatible Brands

CAT Komatsu Hitachi Volvo Hyundai Doosan Kobelco SANY XCMG

System-Matched Supply — Verified against specific DPA and DPS injection pump variants to prevent electrical mismatch and fuel cut-off failure during engine rebuilds.

Technical Specifications

Parameter Value
Part Number 7167-620B
Product Type Stop Solenoid
Cross-Reference 7167-620B, 7167620B, 9009-049, 9009049 (reference only for identification purposes)
Machine Fitment Models utilizing CAV LUCAS DPA/DPS fuel systems
Voltage 12V
Compatible Systems DPA, DPS
Condition New Aftermarket
Warranty 3-12 months against manufacturing defects
Certification ISO 9001

Application Suitability

Engine System Related Components
Fuel Injection Pump (CAV LUCAS DPA) Pump seal kits, fuel transfer lines, injection nozzles
Fuel Injection Pump (CAV LUCAS DPS) Electronic governor wiring, fuel filters, return line fittings
Engine Shutdown Circuitry Wiring harness connectors, relay switches, ignition key contacts
Diesel Fuel Delivery System Primary and secondary fuel filters, water separators, feed pumps

Why the Same Stop Solenoid Fails Repeatedly on the Same Machine

A replacement 12V Fuel Cut-off Stop Solenoid engine rebuild unit often fails within weeks when the root cause lies elsewhere in the system.

In mining operations across Latin America, I have watched workshops replace this solenoid multiple times on a single machine, only to have it burn out again. The problem usually traces back to voltage supply issues—corroded connectors, damaged wiring harnesses, or a failing relay sending erratic current. Contaminated fuel causes the internal valve to stick, forcing the solenoid to work harder until the coil overheats [NEED_CITE: diesel fuel contamination effects on injection system components]. Without addressing these system-level issues, even a perfectly manufactured stop solenoid will fail prematurely.

12V Fuel Cut-off Stop Solenoid engine rebuild showing electrical connector and mounting interface

Matching the Solenoid to Your Specific Fuel Injection System

The 12V Fuel Cut-off Stop Solenoid engine rebuild component must match the exact DPA or DPS injection pump variant on your machine. Production runs of the same engine model sometimes used different pump configurations, requiring solenoids with different connector types or mounting patterns. Before ordering, verify the injection pump serial number and cross-reference it against the solenoid specifications to ensure electrical and mechanical compatibility.

System-Level Diagnostics Before Component Replacement

When a stop solenoid fails, investigate the entire fuel cut-off circuit. Check voltage at the connector during engine shutdown—insufficient voltage indicates wiring degradation or poor connections [NEED_CITE: electrical system diagnostic procedures for diesel injection components]. Inspect fuel quality for particulate contamination that could jam the solenoid valve. Replace fuel filters and clean the fuel tank if contamination is present, addressing the fault that destroyed the previous solenoid rather than just replacing the failed part.

Electrical Specifications and Operational Demands

The 12V rating means this solenoid operates within standard heavy equipment electrical systems, but actual voltage fluctuates during engine cranking and alternator charging cycles. The coil must withstand voltage spikes when the ignition circuit opens, and sustained current draw generates heat that degrades insulation over time [NEED_CITE: electromagnetic coil thermal management in diesel applications]. Quality aftermarket units use winding specifications and insulation materials designed for these thermal cycles, not just initial engagement function.

Stop solenoid cross-section showing internal plunger, coil winding, and electrical connector

The Hidden Cost of Repeated Rework

Replacing a stop solenoid seems straightforward until you factor in the cumulative downtime from multiple failures, the labor cost of repeated disassembly, and the risk of damaging adjacent fuel system components during each removal. Workshops that skip system diagnostics and simply swap parts end up spending more over time than those who invest in proper troubleshooting upfront [NEED_CITE: total cost of ownership analysis for diesel fuel system repairs]. A single misdiagnosis can cascade into weeks of machine unavailability.

Why Source This Component Through XUNPO

We maintain stock of both self-produced and qualified sourced fuel system components under one warranty and one account. Our technical team verifies DPA/DPS pump compatibility against engine serial numbers before shipment, catching variant mismatches that generic cross-reference tables miss. Minimum order from one piece means you can test fitment before committing to bulk. Each unit ships with quality inspection records documenting coil resistance testing and engagement cycle verification, plus part compatibility sheets confirming the cross-reference match to your specific injection system.

Documentation & Verification

  • Commercial invoice listing stop solenoid quantity and cross-reference numbers for customs clearance
  • Part compatibility sheet confirming DPA/DPS pump variant match (cross-reference only)
  • Quality inspection record showing coil resistance and functional cycle test results
  • Warranty terms covering manufacturing defects for 3-12 months from dispatch date
  • Packing photographs documenting condition before shipment
  • HS code documentation support for fuel system component import classification

Installation & Rebuild Sequence

  • Disconnect battery before removing old solenoid to prevent electrical shorts during installation
  • Clean mounting surface on injection pump housing to ensure proper seal and alignment
  • Verify connector pin condition and replace corroded terminals before attaching new solenoid
  • Torque mounting bolts to manufacturer specification—overtightening distorts the solenoid body
  • Test fuel cut-off function before reassembling engine covers to confirm proper engagement
  • Document installation date and machine hours for future maintenance tracking

Requesting a Compatibility Quote

Provide your engine model, injection pump serial number, and any previous rebuild history so we can verify which DPA or DPS variant your machine uses. If the nameplate is worn or painted over, send clear photographs of the pump body and existing solenoid connector—we can identify the correct part from physical features alone. Mention any recurring electrical or fuel delivery issues you have experienced so we can advise on system-level components that may need attention alongside the stop solenoid.

Frequently Asked Questions

Q: How do I confirm which DPA/DPS variant my injection pump is? A: Check the injection pump data plate for the full model and serial number. If the plate is missing or illegible, photograph the pump body, solenoid mounting area, and electrical connector. We cross-reference these physical features against manufacturer specifications to identify your exact pump variant and confirm solenoid compatibility before shipping.

Q: What other fuel system components should I inspect or replace alongside the stop solenoid? A: Inspect fuel filters for contamination, check fuel lines for degradation, and verify the fuel transfer pump operates correctly. If the previous solenoid failed prematurely, examine the entire electrical circuit including wiring, connectors, and relays. Addressing these adjacent components prevents the same failure from recurring on your replacement unit.

Q: My solenoid failed again quickly—what system-level issues could cause that? A: Common causes include voltage supply problems such as corroded connectors, damaged wiring, or failing relays that send erratic current. Fuel contamination causing the internal valve to stick forces the coil to overwork until it burns out. Systematic diagnosis of the electrical and fuel delivery systems identifies these root causes before they destroy another replacement component.

Q: Do different engine serial numbers within the same model use different solenoids? A: Yes, manufacturers sometimes changed injection pump suppliers or configurations during production runs, resulting in different solenoid requirements for the same engine model. The engine serial number determines which pump variant was originally installed. We verify this against your specific serial number rather than relying solely on the engine model designation.

Q: How do I verify the electrical supply is not causing premature solenoid failure? A: Measure voltage at the solenoid connector during engine shutdown to confirm it reaches specification. Check for voltage drops along the wiring harness that indicate resistance from corrosion or damage. Inspect relay contacts for pitting or arcing. Replace any degraded components in the circuit to ensure stable current delivery to your new stop solenoid.

Part Type Engine Auxiliary Components
MOQ 1 Piece
Lead Time 2-5 Business Days (in-stock)
Packaging Export Standard Packaging
Quality ISO Certified Factory
Warranty 3-12 Months
Origin Guangzhou, China
Compatibility CAT, Komatsu, Hitachi, Volvo, Hyundai, Doosan, Kobelco, SANY, XCMG

Shipping Policy

  • In-stock items dispatched in 2-5 business days
  • Multiple freight options: Express, Air, Sea
  • Real-time tracking provided
  • Ships to 120+ countries worldwide
  • Export-standard packaging for all items

Warranty & Quality

  • 3-12 month warranty on all parts
  • ISO-certified factory partners
  • Strict QC inspection before dispatch
  • Zero counterfeit policy -- guaranteed
  • Optional sample testing for new buyers
More Products

RELATED PARTS

Engine Auxiliary Components

12V Fuel Stop Solenoid 16851-60014 for Kubota BX2350D | Engine Grade

<p><strong>16851-60014 Stop Solenoid, 12V Fuel Shutdown</strong> — compatible with Kubota BX2350D, BX2360, BX24D, BX25, G1900, GR2120 and related tractor engines.</p> <ul> <li>Interfaces directly with the fuel injection pump; inspect wiring harness terminals, relay condition, and mounting gasket when replacing to address root-cause electrical or fuel faults</li> <li>Cross-reference verified against 052600-4530, 16851-60015, 16851-60010 and related interchange numbers for variant-specific fitment</li> <li>Overhaul kit supplementation supported — add this solenoid alongside fuel system seals and electrical connectors for a complete engine auxiliary refresh</li> </ul> <p>Overhaul kit contents cross-checked item by item before dispatch to match your engine build requirements.</p>

View Details
Engine Auxiliary Components

Fuel Shut Off Solenoid 16200-Z6L-003 for Honda GX630 GX660 GX690 – System-Matched

<p><strong>16200-Z6L-003 Stop Solenoid</strong> — fuel shut off solenoid for Honda GX630, GX660, GX690 engines. New aftermarket, 12V DC, direct replacement for auxiliary fuel system cutoff.</p> <p>Part of the engine fuel control system — match solenoid plunger stroke and connector pin layout to your engine serial variant. Coordinate replacement with fuel filter and carburettor gasket during service.</p> <ul> <li>Cross-reference: 16200-Z6L-003 (reference only)</li> <li>Fits Honda GX630 / GX660 / GX690 twin-cylinder engines</li> <li>MOQ 1 piece</li> </ul> <p>Rebuild kit contents verified line by line before dispatch.</p>

View Details
Engine Auxiliary Components

Spark Plug 4955850 4937472 5473010 – System-Matched for Cummins ISB5.9G ISC8.3

<p><strong>Spark Plug 4955850, 4937472, 5473010 – Engine Auxiliary Ignition Component</strong> — replacement for Cummins ISB5.9G, ISC8.3, L9N, QSL9, and L GAS PLUS gas engines (CM556, CM2180, CM2380 variants).</p> <ul> <li>Correct heat range and electrode gap matched to natural gas and LPG combustion profiles, preventing misfire-induced damage to valves, pistons, and catalytic converters.</li> <li>Recommended for full-set replacement during top-end refresh or scheduled maintenance alongside ignition coils and fuel system seals.</li> </ul> <p>Overhaul kit contents verified line-by-line before dispatch, ensuring every ignition component matches your engine serial build record.</p>

View Details
Engine Auxiliary Components

12V Stop Solenoid 35DZS1E2 for Deutz 912 913 914 | Engine Grade

<p><strong>35DZS1E2 Stop Solenoid, 12V</strong> — replacement for Deutz 912, 913 and 914 series engines in construction, agricultural and generator applications.</p> <p>This solenoid belongs to the engine fuel shutoff control system. Correct replacement requires verifying engine serial variants for mounting and connector differences, plus inspecting adjacent electrical circuits and fuel delivery components to address the root cause of the original failure.</p> <p>Cross-reference 04233841, 04234373 verified; matched engine electrical components ship together for systematic repair.</p>

View Details
Get a Quote

INTERESTED IN
THIS PART?

Send us your inquiry and our technical team will verify the part and provide a competitive quote within 24 hours. MOQ starts from 1 piece.

2h Part Verification
24h Full Quote

Send Your Inquiry

Fill in the form and we'll get back to you within 24 hours.

Response within 24 hours · No commitment required