Complete Valve Train Set — Matched rocker geometry verified against KA24E cam lobe profile and push rod runout limits before dispatch.
Technical Specifications
| Parameter |
Value |
| Product Type |
Rocker Arm |
| Cross-Reference (reference only) |
13257-40F06, 1325740F06, 13257-40F07, 13257-40F17, 13257-40F16 |
| Machine Fitment |
1989–1997 Hardbody Pickup (KA24E), 1989–1992 Stanza (KA24E), 1989–1991 240SX (KA24E), 1990–1995 Axxess (KA24E) |
| Material |
Forged SAE 1045 Steel |
| Surface Treatment |
Phosphate Coating, Induction Hardening (HRC 42–46) |
| Dimensional Tolerance |
±0.02 mm |
| Lift Ratio |
1.5:1 |
| Torque Specification |
18–22 N·m |
| Assembly State |
Complete Set |
| Warranty |
6-month manufacturer defect warranty |
| Minimum Order Quantity |
1 piece |
Application Suitability
| Engine System |
Related Components |
| Valve Train Actuation |
Camshaft lobes, push rods, valve stem tips |
| Cylinder Head Assembly |
Valve stem seals, valve springs, spring retainers |
| Lubrication Feed |
Rocker shaft oil passages, cylinder head oil gallery |
| Emission Control Base |
Valve seat concentricity, guide clearance |
Why Replacing Rocker Arms Alone Rarely Fixes the Noise
A complete valve train audit prevents the same Rocker Arm Set for Nissan KA24E engine rebuild from failing again within months.
When a rocker arm shows accelerated wear on the valve stem contact pad or the push rod cup, the root cause usually sits elsewhere in the system. A slightly bent push rod introduces lateral loading that scours the cup surface. A worn camshaft lobe changes the acceleration profile, forcing the rocker to impact rather than roll through its arc. I have opened KA24E heads where the previous shop replaced only the rockers, and the new units were notched within a few thousand kilometers because the underlying push rod runout was never checked [NEED_CITE: valve train failure root cause analysis in SOHC engines]. Addressing the symptom without tracing the load path simply resets the clock on the same failure.

The Valve Train as a Load Chain
Every component from the cam lobe to the valve stem tip transmits force through the rocker arm pivot. When this Rocker Arm Set for Nissan KA24E engine rebuild goes in, the mating surfaces it contacts must be within specification or the new set absorbs the mismatch. Inspect each push rod for straightness on a V-block, measure cam lobe lift against the factory profile card, and check valve stem tip height for uneven wear that indicates prior seat recession.
Sequence Variants and Overhaul History
Engines that have been rebuilt before may carry oversize valves or non-standard spring pressures that alter the load on the rocker tip. The 1.5:1 lift ratio in this set assumes standard cam base circle and valve stem length. If the block or head has been machined, verify that deck height changes have not shortened the effective push rod length, which would shift the rocker contact patch off-center on the valve stem. Confirming these details before assembly avoids the come-back that no warranty covers [NEED_CITE: cylinder head decking effects on valve train geometry].
Decoding the Material and Hardness Spec
The forged SAE 1045 steel body provides a ductile core that resists shock loading during cold start, while induction hardening on the pivot and valve contact surfaces to HRC 42–46 gives the wear interface the surface endurance to survive boundary lubrication at low oil temperature. The phosphate coating holds oil during the first critical seconds of operation after start-up, which matters most in delivery fleets where engines cycle through frequent cold starts. Dimensional tolerance held to ±0.02 mm on the push rod cup depth and bolt hole centerline means the set drops onto the existing rocker shaft without selective fitting.

The Cost of Skipping the System Check
Fitting new rockers over a worn cam profile causes the hard-faced rocker tip to accelerate through the lobe ramp, generating impact loads that spall the hardened surface prematurely. The result is a second teardown, another head gasket set, another round of valve stem seals, and a customer who has lost confidence. In fleet operations, the cumulative downtime from repeat valve train failures compounds quickly across multiple units [NEED_CITE: unplanned downtime cost modeling in commercial fleet maintenance].
What This Supply Arrangement Covers
Our production and sourcing lines operate under a single warranty account, so whether the Rocker Arm Set for Nissan KA24E engine rebuild ships alone or alongside a full overhaul gasket kit, the coverage terms are identical. The Guangzhou warehouse holds common valve train components for immediate dispatch, and identification is possible from a part number, a machine model, or a photograph of a worn nameplate. Cross-reference verification covers superseded numbers like 13257-40F07 and 13257-40F17, reducing the chance of ordering against a discontinued listing. A sample can ship ahead of a bulk commitment for fitment confirmation on the bench before the full consignment is released.
Documentation & Verification
- Commercial invoice listing each rocker arm position and cross-reference number applied
- Compatibility sheet confirming KA24E variant coverage with reference-only OEM numbers
- Dimensional inspection record covering cup depth, pivot bore, and bolt hole centerline
- Warranty terms stating six-month defect coverage from dispatch date
- Packing photographs showing set completeness and phosphate coating condition before crating
- HS code and customs classification support for destination-country import filing
Installation & Rebuild Sequence
- Clean rocker shaft and oil feed passages in the cylinder head to bare metal before assembly
- Verify push rod straightness and cam lobe lift prior to fitting this complete rocker arm set
- Apply assembly lubricant to pivot bore and valve stem contact pad to protect during initial cranking
- Torque rocker mounting bolts to 18–22 N·m following the factory sequence pattern
- Set valve lash cold, then re-check after first heat cycle to confirm stable geometry
Requesting a Fitment Quote
Provide the engine serial number and model year of the KA24E unit, along with any previous rebuild records noting oversize valves or head machining. If the nameplate is illegible, a photograph of the existing rocker arm beside a ruler allows cross-reference confirmation. State whether push rods, valve stem seals, or a full gasket set are needed in the same shipment.
Frequently Asked Questions
Q: What other valve train components should I inspect or replace when installing new rocker arms?
A: Check push rod straightness, camshaft lobe profile, valve stem tip condition, and valve guide clearance. Worn guides allow the valve to move laterally under rocker load, accelerating contact pad wear. Replace valve stem seals at the same time since head disassembly is already complete and marginal seals will leak oil into the combustion chamber once reassembled.
Q: Does this set cover all cylinders or just one bank on the KA24E SOHC?
A: This is a complete set covering all eight valve positions on the four-cylinder SOHC KA24E head. There is no bank separation on this inline configuration. The set ships as one consignment so that no cylinder receives old hardware while others get new, which would create uneven valve timing across the firing order.
Q: How do I confirm my engine serial variant matches this part?
A: Share the engine serial number and model year from the block stamping or vehicle registration. Cross-reference numbers 13257-40F06 through 13257-40F17 cover the production span of the KA24E across Hardbody, Stanza, 240SX, and Axxess applications. We verify the match before dispatch to avoid variant mismatch on the bench.
Q: Can I order matched push rods and valve stem seals together for a complete overhaul?
A: Yes, push rods, valve stem seals, gasket sets, and cam bearings ship under one account and one consignment. Consolidating the full valve train and sealing package into a single dispatch avoids split deliveries that delay reassembly and keeps all components under identical warranty terms from the same supply source.