Laser Iridium Spark Plug SILZKR7C11S - Engine Grade for Honda CR-V Accord
<p><strong>Matched set quantities shipped together with gap and resistance inspection records for every unit.</strong></p>
View Details
<p><strong>35DZS1E2 Stop Solenoid, 12V</strong> — replacement for Deutz 912, 913 and 914 series engines in construction, agricultural and generator applications.</p> <p>This solenoid belongs to the engine fuel shutoff control system. Correct replacement requires verifying engine serial variants for mounting and connector differences, plus inspecting adjacent electrical circuits and fuel delivery components to address the root cause of the original failure.</p> <p>Cross-reference 04233841, 04234373 verified; matched engine electrical components ship together for systematic repair.</p>
MOQ
1 Piece
Lead Time
2-5 Business Days
Shipping
120+ Countries
Warranty
3-12 Months
Compatible Brands
Engine Variant Confirmed — Serial-range cross-check prevents wrong stop solenoid variant from reaching the rebuild bench.
| Parameter | Value |
|---|---|
| Part Number | 35DZS1E2 |
| Product Type | Stop Solenoid |
| Cross-Reference | 04233841, 0423 3841, 04234373, 0423 4373, 35DZ/S/1/E/2, 35DVZS1E2, 35DVZ/S/1/E/2 (reference only) |
| Machine Fitment | BFL914, BF 3L 914, D 3L 91403, F 3L 914, D 4L 91404, D 5L 91406, F 5L 914, D 6L 91406, TCD 6L 91406, Deutz 912, Deutz 913, Deutz 914 |
| Voltage | 12V |
| Condition | New Aftermarket |
| Warranty | 3–12 months against manufacturing defects |
| Manufacturing Standard | ISO-certified production |
| Engine System | Related Components |
|---|---|
| Fuel shutoff control | Fuel injection pump linkage, shutoff lever, return spring |
| Engine electrical circuit | Wiring harness connectors, relay, ignition switch contacts |
| Engine auxiliary group | Thermostat housing, belt tensioner, alternator bracket bolts |
| Fuel delivery system | Fuel filter head, supply pump diaphragm, banjo bolt washers |
The replacement part is rarely the problem — the root cause lives elsewhere in the circuit.
I have spent years in the Pearl River Delta warehouse district moving from parts catalogue lookup to technical support, and the pattern repeats itself across Deutz 912 and 913 engine rebuilds. A stop solenoid burns out within a short period after installation, the blame lands on the component, and another unit gets swapped in. What actually happened is a voltage spike from a failing alternator regulator, corrosion inside the connector that creates resistance heating, or fuel varnish jamming the plunger bore. [NEED_CITE: common causes of solenoid coil burnout in mobile diesel applications] The 12V stop solenoid engine replacement for Deutz applications requires the technician to trace the fault backward before fitting the new unit. Ignoring this step turns a single-component replacement into a recurring expense.
This stop solenoid belongs to the fuel shutoff control circuit on Deutz 912, 913, and 914 series engines. When the ignition is switched off, the solenoid de-energises and the internal spring drives the plunger to cut fuel delivery at the injection pump. The adjacent wiring connector, the relay upstream, and the mechanical linkage inside the pump housing all share responsibility for clean shutoff. Replacing only the solenoid while a corroded terminal or a sticky linkage remains in the system invites the same failure to reappear. A 12V stop solenoid engine replacement for Deutz units should always be evaluated as part of the broader electrical and fuel delivery system.
Within the Deutz 914 family alone, several sub-models — D 3L 91403, D 4L 91404, D 5L 91406, D 6L 91406 — carry different injection pump configurations and, in some cases, different solenoid mounting orientations or connector pin layouts. The same base part number can ship in variants with different plunger stroke lengths or different spade terminal configurations. [NEED_CITE: Deutz engine serial variant identification procedures for aftermarket parts] Before ordering, the engine serial plate must be cross-checked against the variant list, because a solenoid that physically threads in but has the wrong stroke length will either fail to shut off the engine or bind the plunger on every cycle. This verification step is non-negotiable for the 12V stop solenoid engine replacement for Deutz applications across the 912 through 914 range.
The 12V rating means the solenoid coil is wound for nominal vehicle system voltage, but real-world charging systems on construction equipment routinely push voltage higher during bulk-charge phases. Coil resistance determines current draw and, consequently, operating temperature inside the winding. Excessive heat degrades the insulation on the copper wire over repeated duty cycles, eventually causing a short between windings and coil failure. The solenoid body must also maintain a seal where it penetrates the fuel gallery or pump housing — fuel ingress past a degraded O-ring or gasket face will contaminate the coil chamber from the inside. [NEED_CITE: solenoid ingress protection standards for engine bay electrical components] These two factors — thermal stress on the winding and fuel-side sealing integrity — define service life more than any single material choice.
When a rebuild shop installs a new stop solenoid without checking the alternator output, the connector condition, and the injection pump linkage freedom, the replacement unit absorbs the same electrical or mechanical abuse that destroyed the original. The machine returns to the field, the solenoid fails again within a short operating period, and the customer loses confidence in both the part and the repair. [NEED_CITE: repeat failure patterns in diesel engine electrical components] For the shop, the cost is not just the warranty claim — it is the labour to pull the machine back in, the freight on the replacement, and the reputation hit with a fleet operator who expected the first repair to hold. This is why the 12V stop solenoid engine replacement for Deutz engines must be paired with a system-level diagnostic checklist.
Our own production lines and qualified sourced supply operate under a single account and a single warranty, so the stop solenoid ships alongside matched fuel filters, seal kits, and overhaul gaskets without juggling multiple vendor terms. Eight product categories sit in one consignment, meaning the complete fuel system job moves in one dispatch rather than three separate shipments. Minimum order starts at one piece, so a single emergency replacement does not require padding an order. Our Guangzhou warehouse holds common Deutz electrical items for fast release, and part identification can be confirmed from the number, the machine model, a photograph of the old unit, or a nameplate image. Cross-reference verification covers superseded and alternate numbers — including the 04233841 and 04234373 references — to catch variant mismatches before dispatch. Technical support is available to confirm compatibility and grade against your specific engine serial. [NEED_CITE: aftermarket cross-reference verification methodology for diesel engine components]
Provide the Deutz engine model and serial number from the nameplate, along with any previous rebuild history that might have changed the injection pump or wiring configuration. If the old solenoid is still available, a photograph of the connector face and the body markings helps us confirm the exact variant before quoting. For shops planning an overhaul package, share the full engine job list so we can consolidate the stop solenoid with matching seals, gaskets, and electrical components in a single dispatch.
Q: How do I confirm which stop solenoid variant fits my specific Deutz engine serial? A: Send us the engine model designation and the serial number from the nameplate. We cross-reference the serial range against variant records that cover mounting orientation, connector type, and plunger stroke. If the nameplate is unreadable, a photograph of the old solenoid body and connector allows us to identify the correct variant before committing to an order.
Q: What other engine electrical components should I inspect when replacing the stop solenoid? A: Check the wiring connector for corrosion or loose pins, test the relay upstream for contact resistance, and verify alternator output voltage under load. Inspect the injection pump shutoff linkage for freedom of movement. These adjacent components often carry the fault that caused the original solenoid failure, and replacing them together prevents a repeat visit to the same repair.
Q: Why did my previous solenoid fail — how do I avoid repeat failure? A: Common causes include voltage spikes from a failing alternator regulator, connector corrosion creating heat buildup, and fuel varnish restricting plunger travel inside the bore. Diagnose the root cause by measuring system voltage and checking connector condition before fitting the replacement. Addressing the underlying fault ensures the new solenoid operates within its design parameters and delivers its full service life.
Q: Are all the listed cross-reference numbers interchangeable for my engine? A: The cross-reference numbers 04233841, 04234373, and the 35DVZS1E2 variant are listed for identification purposes and may cover different production runs or sub-model variants. They are not automatically interchangeable across every Deutz 912, 913, and 914 engine serial. Confirm fitment against your specific engine serial before ordering to avoid receiving a variant with incorrect stroke length or connector configuration.
Q: Can I order a sample to verify fitment before committing to a bulk purchase? A: Yes. We supply single units so you can physically verify the mounting thread, connector type, and plunger engagement on your specific injection pump before ordering in quantity. This step is especially valuable when working with older Deutz engines that may have undergone previous rebuilds with non-standard pump configurations.
<p><strong>Matched set quantities shipped together with gap and resistance inspection records for every unit.</strong></p>
View Details<p><strong>P610-B1V12 Stop Solenoid, 12V Pull-Type With Springs</strong> — fuel shut-off component for engine management systems across excavators, loaders, bulldozers, and tractors.</p> <ul> <li>Belongs to the engine auxiliary system; solenoid failure often traces to wiring degradation or relay wear, so inspect the control circuit and fuel rack linkage before fitting</li> <li>Verify engine serial variants to confirm voltage and stroke match the specific build</li> </ul> <p>Compatibility sheet covering cross-reference numbers and applicable engine variants ships with your order.</p>
View Details<p>Stop unexpected engine shutdowns and get reliable, instant fuel cutoff every time — this <strong>12V shutoff solenoid valve</strong> delivers OEM-equivalent response speed and durability for Kubota D722, D782, and D902 engines. No more guessing whether your KX018-4 or U17 excavator will stall mid-operation due to weak coil pull-in force or inconsistent armature travel.</p> <ul> <li>Fits verified models: KX018-4, KX41-3, U15, U17, SCL1000, K008-5 — no adapter kits needed</li> <li>Direct replacement for 1G820-60022, 1G820-60012, and 1G820-60020 — same mounting footprint and electrical interface</li> <li>Coil resistance calibrated to 12.8–13.4Ω at 20°C — critical for stable engagement under low-battery cranking conditions</li> <li>Backed by our 6-month warranty and real-time technical support from Kubota hydraulic & engine specialists</li> </ul>
View Details<p>Get your Kubota D902 back online fast—no more downtime waiting for OEM delays or risking counterfeit starters that fail after 3 months. This <strong>12V 1.2KW Kubota D902 starter motor</strong> delivers instant, reliable cranking even in cold starts and high-resistance conditions, thanks to its robust copper-wound field coils and precision-machined 8-tooth engagement gear.</p> <ul> <li>Direct-fit replacement for D902, D902E, and D902-E2B-DGDE-1 engines—no modifications needed</li> <li>Verified drop-in compatibility with OEM part numbers including <strong>16824-63013</strong> and 16824-63010 (plus 18+ cross-references)</li> <li>Built with dual ball bearings—not bushings—to handle continuous-duty cycling in rental and fleet operations</li> <li>Pre-tested at 12.6V load for torque consistency; ships with full 12-month warranty</li> </ul>
View DetailsSend us your inquiry and our technical team will verify the part and provide a competitive quote within 24 hours. MOQ starts from 1 piece.
Send Your Inquiry
Fill in the form and we'll get back to you within 24 hours.