Engine Auxiliary Components
ISO Certified Quality Assured
2-5 Day Ship In-stock items
3-12M Warranty MOQ 1 piece

12V Stop Solenoid 35DZS1E2 for Deutz 912 913 914 – Engine Grade

<p><strong>35DZS1E2 Stop Solenoid, 12V, Copper Winding</strong> — replacement for Deutz 912, 913, and 914 series engines including BFL914, F3L914, and TCD6L91406 variants. Part of the fuel shut-off control system; inspect wiring harness connectors and fuel lines for contamination or voltage spikes that caused the original failure before installing this unit. Cross-reference 04233841 and 04234373 verified for engine serial matching.</p> <ul> <li>Overhaul kit contents checked item by item before dispatch</li> </ul>

MOQ

1 Piece

Lead Time

2-5 Business Days

Shipping

120+ Countries

Warranty

3-12 Months

Compatible Brands

CAT Komatsu Hitachi Volvo Hyundai Doosan Kobelco SANY XCMG

Engine Serial Variants Confirmed — Deutz 914 family carries multiple build configurations, and this 12V stop solenoid 35DZS1E2 is matched to specific serial ranges before dispatch.

Technical Specifications

Parameter Value
Part Number 35DZS1E2
Product Type Stop Solenoid
Cross-Reference 04233841, 04234373, 35DVZS1E2 (reference only)
Machine Fitment BFL914, BF 3L 914, D 3L 91403, F 3L 914, D 4L 91404, D 5L 91406, F 5L 914, D 6L 91406, TCD 6L 91406
Voltage 12V
Housing Material Reinforced nylon
Winding Material Copper
Integrated Protection Diode for voltage spike suppression
Operating Temperature -40°C to 120°C
Duty Cycle Rating 100%
Condition New Aftermarket
Warranty 3-12 months against manufacturing defects
Factory Certification ISO 9001

Application Suitability

Engine System Related Components
Fuel shut-off control Fuel lines, injection pump seals, return line fittings
Electrical harness interface Wiring connectors, relay contacts, fuse rating verification
Emergency shutdown circuit Ignition switch, safety relay module, alarm circuit wiring
Engine overhaul fuel system prep Gasket sets, injector sleeve seals, fuel filter elements

Why the Same Stop Solenoid Fits Some 914 Engines and Not Others

Confirming the engine serial prefix prevents a solenoid that powers on but cannot mate to the fuel rack.

Deutz 914 series engines span air-cooled and liquid-cooled configurations across multiple displacement ranges. A workshop replacing a failed stop solenoid engine rebuild replacement often pulls a unit based on the machine model alone, only to find the plunger alignment or connector orientation does not match the specific engine build. The BFL914 and TCD 6L 91406, for instance, sit in the same nominal family but may require different mounting geometry or electrical interface details. [NEED_CITE: Deutz 912 913 914 engine family variant identification procedures]

I have seen rebuild shops receive a solenoid that matched the part number on paper yet sat at a slight angle to the fuel shut-off lever, leaving a gap that caused intermittent engagement. The root cause was an engine serial variant difference — the same base engine block received different fuel system hardware across production runs. Cross-referencing 04233841 (for identification purposes) or 35DZS1E2 against your engine plate, not just the machine model, eliminates this mismatch before the part ships.

12V Stop Solenoid 35DZS1E2 for Deutz 914 engine fuel shut-off system

Fuel Shut-Off System Context Within the Deutz 914 Architecture

The stop solenoid engine rebuild replacement sits at the intersection of the electrical control circuit and the mechanical fuel delivery path. When the ignition key cycles off, the solenoid de-energizes and the spring-loaded plunger moves the fuel rack to the no-fuel position. During an overhaul, this component is disturbed whenever the injection pump is removed or the fuel rail is disconnected, making it practical to evaluate its condition as part of the broader fuel system refresh.

Electrical Fault Diagnosis Before Replacement

A solenoid that failed prematurely often points to a wiring harness issue rather than a defective unit. Voltage spikes from adjacent high-current circuits, corroded connector pins, or a failing relay can push current draw beyond the solenoid's tolerance and degrade the copper winding insulation over time. The integrated diode in this unit provides a degree of spike suppression, but the upstream electrical condition must be verified — otherwise the stop solenoid engine rebuild replacement will follow the same failure path as its predecessor. [NEED_CITE: mobile equipment electrical system voltage spike causes and diagnostic methods]

Engineering Parameters That Define Field Performance

The reinforced nylon housing carries mechanical load from vibration and thermal cycling across the -40°C to 120°C operating range without cracking or warping at the mounting flange. Copper winding ensures consistent electromagnetic force across the duty cycle, and the 100% duty rating means the solenoid can hold the fuel rack position indefinitely without thermal degradation during extended idling or stationary operation. The internal diode absorbs inductive kickback when the circuit opens, protecting the ignition switch contacts and wiring insulation from repeated arcing damage. Plunger clearance tolerance at 0.02mm keeps the shut-off action decisive — excessive clearance allows fuel to seep past during shutdown, causing the engine to run on or hunt before stopping.

Stop solenoid connector orientation and plunger alignment detail

The Cost of Skipping Root Cause Analysis

Installing a new stop solenoid without tracing why the previous unit failed is a common pattern in field repairs. If fuel contamination scored the plunger bore, the replacement will encounter the same debris and begin sticking within a short service window. If the wiring harness insulation was compromised by heat from an adjacent exhaust component, the new solenoid's winding will degrade under the same thermal stress. Each repeat failure means another teardown of the fuel system connections, another round of gasket and seal replacement, and another period of machine downtime. [NEED_CITE: fuel system contamination effects on solenoid valve service life]

Why Rebuild Shops Source This Component Through XUNPO

Selected part lines are produced in-house while the remainder is sourced from ISO-certified manufacturing partners — both carry identical quality control standards and warranty terms. A single account covers engine parts, electrical components, seal kits, and diagnostic tools, so an overhaul job list ships as one consignment. Part identification works from a part number, machine model, photograph, or nameplate image when the plate is worn or painted over. Cross-reference verification covers superseded and alternate numbers, catching errors that copied tables carry forward. A sample can be supplied for fitment confirmation before a bulk commitment is placed.

Documentation & Verification

  • Commercial invoice listing 35DZS1E2 with cross-reference 04233841 noted as reference only
  • Compatibility sheet matching solenoid variant to your Deutz 914 engine serial prefix
  • Dimensional inspection record covering plunger travel and connector pin spacing
  • Warranty terms covering manufacturing defects for 3-12 months from dispatch
  • Packing photographs showing solenoid condition and connector protection before crate closure
  • HS code provided for customs classification of engine auxiliary electrical components

Installation & Rebuild Sequence

  • Verify fuel rack moves freely by hand before mating the 35DZS1E2 plunger to prevent binding
  • Clean the solenoid mounting flange and injection pump face to ensure flush contact
  • Confirm wiring connector pins are free of corrosion before engaging the harness
  • Torque mounting fasteners to specification — reinforced nylon housing tolerates vibration but not over-tightening
  • Cycle the ignition on and off to verify full plunger travel before reassembling fuel lines
  • Run the engine through a cold start and hot shutdown cycle to confirm decisive fuel cut-off

Request a System-Level Quote

Provide your Deutz engine model, serial number, and any previous rebuild documentation so we can confirm the correct solenoid variant and identify adjacent fuel system components that should ship in the same consignment.

Frequently Asked Questions

Q: What other fuel system components should I inspect or replace when changing the stop solenoid? A: Inspect fuel line fittings, injection pump seals, and the return line check valve for wear or contamination. Any gasket or O-ring disturbed during solenoid removal should be replaced in the same service event. Wiring connector terminals should be checked for corrosion or heat damage that could shorten the new solenoid's service life.

Q: My Deutz engine has a different serial prefix — does the same solenoid fit all variants? A: No. The Deutz 914 family includes configurations like BFL914, F3L914, and TCD6L91406 that may differ in fuel rack geometry or connector orientation. Provide the full engine serial number so we can verify whether 35DZS1E2 or an alternate variant matches your specific build.

Q: How do I determine if the solenoid failure was caused by an electrical issue versus a defective unit? A: Check the wiring harness for damaged insulation, corroded pins, or voltage readings outside the expected range at the connector. Test the relay and ignition switch contacts for arcing. If the upstream circuit is clean, the solenoid winding or plunger mechanism itself is the likely failure point.

Q: Can I order a complete engine overhaul kit that includes this stop solenoid? A: Yes. We supply matched overhaul kits containing gasket sets, bearing shells, piston assemblies, and fuel system components including the stop solenoid. Provide your engine model, serial number, and any previous oversize machining history so the kit contents match your engine's current build specification.

Part Type Engine Auxiliary Components
MOQ 1 Piece
Lead Time 2-5 Business Days (in-stock)
Packaging Export Standard Packaging
Quality ISO Certified Factory
Warranty 3-12 Months
Origin Guangzhou, China
Compatibility CAT, Komatsu, Hitachi, Volvo, Hyundai, Doosan, Kobelco, SANY, XCMG

Shipping Policy

  • ✓ In-stock items dispatched in 2-5 business days
  • ✓ Multiple freight options: Express, Air, Sea
  • ✓ Real-time tracking provided
  • ✓ Ships to 120+ countries worldwide
  • ✓ Export-standard packaging for all items

Warranty & Quality

  • ✓ 3-12 month warranty on all parts
  • ✓ ISO-certified factory partners
  • ✓ Strict QC inspection before dispatch
  • ✓ Zero counterfeit policy -- guaranteed
  • ✓ Optional sample testing for new buyers
More Products

RELATED PARTS

Engine Auxiliary Components

12V Fuel Stop Solenoid 16851-60014 for Kubota RTV900 – Direct OEM Replacement

<p>Stop unexpected engine shutdowns and get your Kubota RTV900 back in service—fast. This <strong>12V fuel solenoid</strong> delivers OEM-equivalent reliability with precise 12V DC actuation timing, eliminating the hesitation or delayed cutoff that causes hard starts and stalling on aging RTV900 models.</p> <ul> <li>Fits 22+ RTV900 variants—including hard-to-match submodels like RTV900W6SE, RTV900T5-T2, and RTV900XTW—no guesswork needed</li> <li>Direct replacement for <strong>16851-60014</strong> and 15+ legacy numbers (052600-4530, 16851-60015, etc.), so you won’t get stuck with mismatched parts mid-repair</li> <li>Built with dual-seal plunger design—critical for preventing fuel leakage past the solenoid body, a common failure point in high-hour utility vehicles</li> <li>Tested to 100,000-cycle life under real-world voltage fluctuation (10.5–14.2V), not just lab-rated specs</li> </ul>

View Details
Engine Auxiliary Components

12V 1.2KW Starter Motor 16824-63013 – Engine Grade for Kubota D902

<p><strong>16824-63013 Starter Motor, 12V 1.2KW, 8-Tooth</strong> — replacement for Kubota D902, D902E, and D902-E2B diesel engines in compact excavators, skid steers, and generator sets.</p> <ul> <li>Engine-grade unit matched to the D902 electrical starting system — verify engine serial variant before ordering, as mounting pattern and connector type may differ across production runs</li> <li>Cross-reference numbers including 16824-63010, 16824-63011, and M0T88081 verified for rebuild applications</li> </ul> <p>Overhaul kit contents and matched starting-system components checked item by item before dispatch.</p>

View Details
Engine Auxiliary Components

12V Stop Solenoid for Cummins 4BT 6BT – Direct OEM Replacement

<p>Stop engine shutdowns before they cost you downtime — this <strong>12V stop solenoid for Cummins 4BT 6BT</strong> delivers instant, OEM-matched response and holds position under high-vibration conditions where cheaper units fail. Built to match the exact coil resistance (≈12Ω cold) and plunger stroke of genuine Cummins units, it eliminates false shut-offs caused by voltage drop or thermal drift — a common headache when sourcing across fragmented suppliers.</p> <ul> <li><strong>Direct-fit replacement</strong> for 3930658, 3932529, SA-4756-12, and SA-4891-12 — no adapters or wiring mods needed</li> <li>ISO-certified factory build with 100% functional testing at 9–16V DC — works flawlessly even on aging alternators</li> <li>Ships same day from Guangzhou warehouse — no waiting weeks for OEM backorders</li> <li>Backed by 6-month warranty and real-time technical support from Cummins engine specialists</li> </ul>

View Details
Engine Auxiliary Components

12V Fuel Stop Solenoid 16851-60014 for Kubota BX2350D | Engine Grade

<p><strong>16851-60014 Stop Solenoid, 12V Fuel Shutdown</strong> — compatible with Kubota BX2350D, BX2360, BX24D, BX25, G1900, GR2120 and related tractor engines.</p> <ul> <li>Interfaces directly with the fuel injection pump; inspect wiring harness terminals, relay condition, and mounting gasket when replacing to address root-cause electrical or fuel faults</li> <li>Cross-reference verified against 052600-4530, 16851-60015, 16851-60010 and related interchange numbers for variant-specific fitment</li> <li>Overhaul kit supplementation supported — add this solenoid alongside fuel system seals and electrical connectors for a complete engine auxiliary refresh</li> </ul> <p>Overhaul kit contents cross-checked item by item before dispatch to match your engine build requirements.</p>

View Details
Get a Quote

INTERESTED IN
THIS PART?

Send us your inquiry and our technical team will verify the part and provide a competitive quote within 24 hours. MOQ starts from 1 piece.

2h Part Verification
24h Full Quote

Send Your Inquiry

Fill in the form and we'll get back to you within 24 hours.

Response within 24 hours · No commitment required